Subscribe to the daily news Sign in
En
17 November 2023

2023 CEBA Built by the Best Award Recipients Announced

The Controlled Environment Building Association (CEBA) proudly announced Fisher Construction Group for their NewCold Project in Lebanon, IN, United States and Ti Cold for their CORE X COMPLETE Project in Sturbridge, MA, United States as the recipients of the 2023 CEBA Built By The Best Award. The announcement took place during the closing General Session of the 43rd CEBA Annual Conference and Expo held in Palm Springs, CA this week. CEBA saw a record 430+ controlled environment building professionals registered for the Conference.

“Congratulations to Fisher Construction Group & NewCold along with Ti Cold & CORE X COMPLETE for achieving CEBA’s 2023 Built By The Best Awards! Both represent the CEBA standard of excellence in controlled environment building and design. These first-rate facilities will enable your customers to deliver on the promise they make to their customers.” Brian Lynch, Executive Director, Controlled Environment Building Association (CEBA)

Fisher Construction Group received the CEBA Built By The Best Award in the over $35MM Category. The award-winning Project with NewCold is an advanced, large-scale automated cold store facility which is the biggest in Indiana and one of the largest in the United States. At 141 feet high (43 meters), spans an impressive 150,616 square feet and holds over 100,000 pallet positions. The cold storage facility uses state-of-the-art technology including automated storage and retrieval systems (ASRS) to automatically move and store products in the ‘dark’ high-bay warehouse This remarkable achievement has positioned the facility as an industry standout, demonstrating Fisher Construction Group’s commitment to excellence and innovation.

“We are thrilled and honored to receive the CEBA Built By The Best Award for our work on NewCold’s Indianapolis facility. This recognition is a testament to the dedication and expertise of our teams, Fisher and NewCold, who worked tirelessly to deliver a facility that surpasses industry standards. This award represents the continued ability to work as a team, to move forward as one, and to pursue excellence together” said Chris Wright, Project Manager at Fisher Construction Group.

Ti Cold, who was a finalist in both categories this year, received the CEBA Built By The Best Award in the Under $35 MM Category. The award-winning Project was built for CORE X COMPLETE in Sturbridge, MA. This best-in-class high-density facility encompasses an 83,000 sq. ft. that houses 18,000 pallet positions. In addition, they have successfully adopted mobile racking technology, utilized a transcritical CO2 refrigeration system and other energy efficient and sustainable technologies, such as powerful heat reclaim, optimized overhead lighting, energy-conserving LOE, office window tint, and more.

“We are deeply honored to be the recipient of the CEBA Built By The Best Award. We extend our appreciation to CEBA for recognizing our efforts and to the entire team at Ti Cold for their dedication to excellence. This award motivates us to continue pushing the boundaries of what is possible in cold storage,” added Sam Tippmann, Founder and CEO, Ti Cold.

​​​This year there were nine submissions for the award.

Award Finalists:

Over $35MM Category:
• Fisher Construction Group | NewCold, Lebanon, IN, United States
• Ti Cold | Sierra Supply Chain Services, Hamilton, ON, Canada

Under $35MM Category :
• Ti Cold | CORE X COMPLETE, Sturbridge, MA, United States
• WDS Construction | Vortex Cold Storage, Albert Lea, MN, United States

Featured Honorable Mention Projects:
• AMC Engineers | Pick n’ Pay, Eastport, Gauteng, South Africa
• Big D Construction | Riverbend Meats, Idaho Falls, ID, United States
• Eng2K | NewCold, Piacenza, Italy
• FCL Builders | Cold Summit Development, Bedford Park, IL, United States
• Primus Builders | RL Cold, Baytown, TX, United States
Share

Related news

Ti Cold Opens 210,000 sq ft Cold Storage Facility in Georgia
New multi-temperature facility in Banks County supports poultry supply chain and local economy. Ti Cold and Banks Cold Storage have completed a new 210,000-square-foot (approx. 19,510 m²...
22 Apr 2025
GCCA Reports 10% Capacity Growth in 2025 Global Top 25 Warehouse List
Global cold storage capacity among top providers grows to 7.3 billion ft³. The Global Cold Chain Alliance (GCCA) has released its 2025 “Global Top 25 List,” highlighting the largest te...
10 Apr 2025
ECOOLTEC TM182 Reduces CO2 Emissions for Ferdinand Bierbichler Fleet
Food wholesaler Ferdinand Bierbichler reports significant CO2 savings from using the ECOOLTEC TM182 transport refrigeration system. The company estimates that its twelve refrigerated trucks equippe...
12 Feb 2025
FreezPak and BG Capital Launch $102M Cold Storage Project in Houston
New facility to offer over 547,000 SF of cold storage space with ASRS integration. BG Capital and FreezPak Logistics, operating under their joint venture BGFP International LLC, have acq...
18 Apr 2025
ECOOLTEC Enters Spanish Market
ECOOLTEC expands sustainable transport refrigeration to the Iberian market. German manufacturer ECOOLTEC Grosskopf GmbH has entered the Spanish market, appointing Ruben Climent as Sales ...
today
Vertical Cold Storage Acquires Frozen Distribution Facility Near Po...
Vertical Cold Storage has expanded its network in the Southeast United States with the acquisition of a frozen distribution center in Pooler, Georgia, near the Port of Savannah. The facility str...
28 Jan 2025